POWER PLANT
Province of Belluno,
Taibon Agordino
Activity
Zollet Ingegneria performed all the activities and the inves-tigation required for the authorization and construction of Corpassa Hydropower Plant, including the hydraulic and hydro-logic research, plant profitability assessment, final and construction design of the works, and also the preparation of all the documents needed for the award of the works.
scientists – assessed the environmental impact and landscape compatibility.
The Corpassa Stream diversion work is lateral draw-off type with a support weir in the riverbed. Heavy physical sedimentation of the water diverted is provided for, by the use - in series - of an external gravel pass and an internal gravel pass, as well as a sand trap to capture small sediment up to a minimum diameter of 0.5 mm with the maximum flow diverted. The intake is completely automated and governed by the control panels installed in the power station.
flow rate
Study
Study
Services
Documents
& Social
Impact Assesment
Planning
Design
Supervision
Pec