POWER PLANT
HYDROELECTRIC _

Slide 03. Position Map 01. DESCRIPTION 02. Engineering Services work CATEGORY Hydropower Italy, Veneto Region,
Province of Belluno,
Taibon Agordino
Location place Corpassa s.r.l client 2007 - 2012 Period of
Activity
work

Slide This plant is run-of-river type with lateral diversion. It is composed of a new weir with intake structure on Stream Corpassa, from whose headpond, (top water level at elevation 939.59 masl) a GFRP and steel pipeline nearly entirely installed under a road (DN700 length 1500m), crosses several culverts as well as the stream in two points, and then reaches the power generation station at elevation 787.70 masl, in which one 4-jet Pelton type turbine is installed.

Zollet Ingegneria performed all the activities and the inves-tigation required for the authorization and construction of Corpassa Hydropower Plant, including the hydraulic and hydro-logic research, plant profitability assessment, final and construction design of the works, and also the preparation of all the documents needed for the award of the works.
arrow_forward_ios next arrow_forward_ios
Slide With the support of expert geologists Zollet Ingegneria sur-veyed the areas involved, thereby determining the lithology of the soils and the geomorphological units at the various sites and – with the support of natural
scientists – assessed the environmental impact and landscape compatibility.

The Corpassa Stream diversion work is lateral draw-off type with a support weir in the riverbed. Heavy physical sedimentation of the water diverted is provided for, by the use - in series - of an external gravel pass and an internal gravel pass, as well as a sand trap to capture small sediment up to a minimum diameter of 0.5 mm with the maximum flow diverted. The intake is completely automated and governed by the control panels installed in the power station.
arrow_forward_ios next arrow_forward_ios
01 description Brief Description

Slide 900 Maximum flow-rate intercepted l/s 426 Annual mean
flow rate
l/s
828.25 Nominal output kw 978.18 Intake elevation masl 785.30 Water return elevation masl 192.88 Statutory head masl

Slide Pre-Feasibility
Study
Investigations 02 Feasibility
Study
Engineering
Services
Tender
Documents
Environmental
& Social
Impact Assesment
Health & Safety
Planning
Detailed
Design
Construction
Supervision

Slide 03 Position Map

Slide Our Projects zolletingegneriasrl@legalmail.it PRIVACY POLICY HELPFUL LINKS Home About Us Services Lybrary News Contact CONTACT US



Pec
INFORMATION Via della Stazione, 40
32035 Santa Giustina
Belluno, Italy
(+39) 0437.859225
(+39) 0437.858549
(+39) 0437.857084
info@zollet.eu
© Copyright 1969 - | Zollet Ingegneria srl - P.IVA: 01158730257 | All Rights Reserved | CREDITS